For skid builders and OEM engineers
Sensors for water-treatment & cooling-water skids
pH, ORP, conductivity, dissolved oxygen, level and pressure options for dosing, filtration and cooling-water equipment.
Bring the measurement points together.
A skid needs sensors that match the process, controller and mechanical connections. Review those requirements together before choosing a probe or transmitter.
Discuss sensor configuration, sample quantities and repeat-order requirements with one team.
Choose by measurement point
Final suitability depends on the exact model and configuration. Review ranges, accuracy, output, connections, materials and operating limits before ordering.
| Sensor family | What to specify | Products |
|---|---|---|
| pH and ORP | Process chemistry, temperature, mounting and controller compatibility. | Explore products ↗ |
| Conductivity | Measurement range, electrode type, cleaning conditions and output. | Explore products ↗ |
| Dissolved oxygen | Water conditions, mounting, output and maintenance requirements. | Explore products ↗ |
| Pressure and level | Range, wetted materials, process connection and electrical output. | Explore products ↗ |
Explore the catalog
Stock, sample quantities and delivery dates are confirmed for your selected configuration.
From requirements to the right configuration
Share the application
Send the measured medium, range, output, connections, quantity and installation location.
Review the configuration
We review candidate models, documentation and compatibility with your equipment.
Confirm the order
Your quote confirms the configuration, price, sample options and delivery schedule.
Common questions
Can you support a small skid-building program?
Send your sample needs, typical lot size and annual volume. We will confirm available configurations and commercial terms.
Will a probe work with my controller?
Compatibility depends on the signal, electrical connection and controller requirements. Provide the controller model and existing probe details.
What should I include with a quote request?
Include the medium, range, temperature, pressure, output, connection, quantity and required date. For water-system projects, include the installation state and project requirements.
For non-hazardous applications. Water-system projects require a review of procurement, funding and connectivity requirements; acceptance is confirmed for the specific project.
Application support
Have a model number or a specification?
Send the details. We'll help you review the next step.


